Subicwater is regulated by Subic Bay Water Regulatory Board with representation from both Olongapo City and Freeport Zone. The regulating body monitors and ensures the efficiency of its operation and fair prices for customers. Recognizing the importance of clean water to good health, the raw water from the rivers is turned into clean drinking water by the following processes. They have chosen Steelfab Water Solutions to build a 2 million Water Tank with a specifications of 14 meters diameter x 13.48h 2000m³ zone 4 seismic 300kph wind load. The project was completed last January 2013 and it only took four (4) weeks with six (6) men on the team. |
Santiago (also Santiago de Chile), is the capital of Chile and the center of its largest conurbation. Santiago’s steady economic growth over the past few decades has transformed it into a modern metropolis. The city is now home to growing theater and restaurant scenes, extensive suburban development, dozens of shopping centers, and a rising skyline, including the tallest building in Latin America, the Gran Torre Santiago. It includes several major universities, and has developed a modern transportation infrastructure, including a free flow toll-based, partly underground urban freeway system and the Metro de Santiago, South America’s most extensive subway system. Steelfab Water Solutions takes pride to install 650m³ Water Tank in the span of six (6) days with five (5) men on the team. |
Dardanup Butchering Company (DBC) is the state’s most notable brand leader in the meat industry and its chain of retail stores are a rich part of rural WA history. Innovative thinking led to the creation of its hugely popular ‘Easy For Me™’ range of ready made meals and now offers customers a suite of over 40 original products to choose from. Steelfab Water Solutions installed 32 meters diameter 6meters tall 5000m³ Water Tank for DBC. It only took us two (2) weeks to build the water tank with 6 men on the team. |
No. | Description | Specifications |
1 | ‘Moula ali full instalation’ | 896 KL (Dia – 12.25 mtrs & Ht 7.60 mtrs.) |
2 | ‘2 Water Tanks’ | 1285 KL x 2 – (Dia – 16.63 mtrs & Ht 5.92 mtrs.) |
3 | ‘3 Water Tanks’ | 180 KL x 2 + 300 KL X 1 |
4 | 25 KL x 4 (Dia 3.5 mtrs. & Ht 2.56 mtrs.) |
No. | Specifications |
1 | 200 m³/hr |
2 | 400 m³/hr |
3 | 100 m³/h |
4 | 100 m³/h (2 units) |
FORMER PROJECTS:
AGNEW GOLD
1 x 220 kl Roof potable water tank
AVEBURY NICKEL PROJECT TASMANIA
BHP RAVENSTHORPE JOINT VENTURE
BHP YARRIE MINE SITE – LEIGHTON CONTRACTORS
BRL HARDIE – BERRI SA
BRL HARDIE – CANBERRA ACT
BRL HARDIE – NANNUP WA
BURRA FOODS SW VICTORIA
CSR READYMIX – DAMPIER PORT UPGRADE
CSR READYMIX – FINNUCANE ISLAND
CSR READYMIX – MURRIN MURRIN MINESITE WA
(8.5 metre diameter x 2.35 high)
DEPARTMENT OF WORKS AND INFRASTRUCTURE NT
DUBAI UAE WORLD ISLANDS
ECO WINERY DEVELOPMENTS – CHITTERING WA
(1 at 12 metre diameter x 2.35 high) (2 at 8.5 diameter x 4.65 high)
EVANS & TATE WINERY LTD – CAPEL WA
(8.5 diameter x 4.65 high as storage
facility)
GHD ENGINEERING – LEONORA WA
HGM ENGINEERING – BIDYADANGA WA
INDIA
IRAQ US AID BECHTEL
JAMAICA
JAMAICA NATIONAL HOUSING TRUST
JAMAICA RESIDENTIAL WATER SUPPLY
LYCOPODIUM ENGINEERING PTY LTD: BLACK SWAN NICKEL PROJECT
-1 x 1344kl open top raw water tank
-1 x 550kl roof potable water tank
MESA A PROJECT NW WESTERN AUSTRALIA
MIDDLE EAST
MURRIN MURRIN NICKEL PROJECT
MURRIN MURRIN OPERATIONS
NEW ZEALAND
NEWMONT NFM GRANITES GOLD MINE
(17metre diameter x 4.65 metre)
(11.7metre diameter x 3.5 metre
high)
NEWMONT NFM GROUNDRUSH SITE
(7.45 metre diameter x 4.65 metre
high)
PAPUA NEW GUINEA ADRA
PIONEER BUILDING MATERIALS PTY LTD – PERTH WA
(5.3 metre x 2.35 metre)
QATAR UNITED STATES AIR FORCE
RIDGEWAY GOLD PROJECT – ORANGE NSW
ROCHE MINING SERVICES
(200 km South of Coolgardie)
2 x 250 kl Roof potable water
SINGAPORE
SOUTHERN METROPOLITAN REGIONAL COUNCIL
THROUGH ENVIRONMENTAL SYSTEMS
WESTERN MINING LTD OLYMPIC DAM
(11.7 metre diameter x 3.5 metre
high)
WMC/ROCHE BROTHERS – MT KEITH WA
(5.4 metre diameter x 10 metre)