UAE, Dubai World Islands Water Supply Project
Their requirement was for portable water storage tanks.
The Situation…
This project required the design, supply and installation of portable water storage tanks for the new World Islands project. A product suitable for site assembly with minimal infrastructure requirements by way of mechanical equipment was stipulated.
The SteelFab Solution…
It was necessary for the dimensions of the tanks design to reduce the footprint area and keep the height down to the required levels. As always the Steelfab design allows for shipping and transporting of materials to remote and inaccessible sites—components are then bolted together to form the shell of the tank.
The Result…
Steelfab’s core competencies in design, production, delivery and installation is exemplified in this case: due to the urgent nature of the contract the tanks were airfreighted from Australia to the UAE and delivered onsite to the installation supervisor within ten days of the order being placed. The two 250kL tanks were efficiently installed within three and half days of receiving the materials.
The suitability of the product for the project was noted by the client—with future projects directly resulting from our ability to design to unique and specific project requirements — rather than expecting our clients to select from pre-determined standard sizes and templated solutions. Our flexible approach in all areas of our business is the key to our clients satisfaction.